SRBA Division: | SRBA Controlled Environments (SRBA CE) |
Customer Name: | Anteryon |
Project Name: | Cleanroom Anteryon at the BIC |
Year built: | 2018 |
Category: |
|
On behalf of ENGIE Zuid-Nederland B.V., SRBA Controlled Environments (SRBA CE) completed a cleanroom with a total area of approx.1,850m² at the new BIC site in 2018. The cleanroom is equipped with a walkable BPM 100 ceiling system with a grid size of 1,200 x 1,200mm. For the walls, use was made of the SRBA CE MOM wall system with 16mm Melamine sheet material, fixed by means of omega profiles with aluminum inlay trim. SRBA CE doors and windows were installed in the walls. SRBA Clean Interior pass-through cabinets with an integrated interlock were installed at 7 locations.
You can follow us through our LinkedIn page
© 2025 Corporate Construction | All Rights Reserved | Site by Questo