SRBA Division: | SRBA Controlled Environments (SRBA CE) |
Customer Name: | ADD / APPO compounding pharmacy |
Project Name: | 270m² clean room for a compounding pharmacy |
Year built: | 2020 |
Category: |
|
The realization of the In cleanroom was done within the existing premises of the pharmacy. SRBA CE and Kuijpers were responsible for the design and engineering activities of this cleanroom. Because the cleanroom had to be placed in an existing hall that needed some modifications, the Point Cloud concept was used for the design process. Using 3D laser scanners, information and dimensions of the existing situation were quickly and accurately collected and visualized in order to correctly build the concept into a CAD drawing.
The GMP classified clean room was constructed with the BCPS wall system in an HPL version. The ceiling was constructed with the BPV ceiling system with a load capacity of 150 kg/m². In addition to the clean room, there were some structural modifications to be made to offices and the entrance to the facility.
PP4CE partner Kuijpers guaranteed the design and construction of the technical installations. Furthermore, Kuijpers was responsible for the building controls and electrical installations such as the evacuation and fire alarm system, lighting and power supply.
SRBA Clean Interior supplied and installed the complete interior including pass-through refrigerators, several safety workbenches and LAF (Laminary Air Flow) cabinets.
The following PP4CE partners contributed to the realization of this GMP facility: